选择特殊符号
选择搜索类型
请输入搜索
Preface
Acknowledgments
Abbreviations
1 I ntroduction
1.1 Reverse Osmosis Fundamentals
1.1.1 Key Components of the Desalination Plant Treatment Process
1.1.2 Key Performance Parameters of RO Systems
1.1.3 Desalination Plant Classification and Configuration
1.1.4 Criteria for Well—Operating Plants
1.2 Source Water Quality Characterization
1.2.1 Minerals
1.2.2 Dissolved Gases
1.2.3 Particulate Foulants and Measurement Methods
1.2.4 Colloidal Foulants
1.2.5 Mineral Membrane—Scaling Compounds
1.2.6 Natural Organic Foulants
1.2.7 Microbiological Foulants and Membrane Biofouling
1.2.8 Pathogens
1.2.9 Oxidants
1.2.10 Compounds That Could Damage RO Membranes
1.2.11 Compounds Impacting Discharge Quality
References
2 Source Water Intakes
2.1 Open Intakes
2.1.1 Inlet Structure and Coarse Screens
2.1.2 Intake Water Conduit
2.1.3 Intake Screens
2.1.4 Intake Pump Station
2.2 Subsurface Intakes
2.2.1 Purpose and Function
2.2.2 Routine Operation
2.2.3 Performance Monitoring
2.2.4 Maintenance
2.2.5 Troubleshooting
References
3 Source Water Pretreatment
3.1 Source Water Chemical Conditioning Systems
3.1.1 Coagulant Feed Systems
3.1.2 Flocculant Feed Systems
3.1.3 Scale Inhibitor Feed Systems
3.1.4 Biocide Feed Systems
3.1.5 Dechlorination Feed Systems
3.1.6 Acid Feed Systems
3.1.7 Sodium Hydroxide Feed Systems
3.1.8 Summary of Typical Operational Problems of Source Water Conditioning and Troubleshooting
3.2 Dissolved Air Flotation Clarifiers
3.2.1 Purpose and Function
3.2.2 Routine Operation
3.2.3 Performance Monitoring
3.2.4 Maintenance
3.2.5 Troubleshooting
3.3 Granular Media Pretreatment Filters
3.3.1 Purpose and Function
3.3.2 Routine Operation
3.3.3 Performance Monitoring
3.3.4 Maintenance
3.3.5 Troubleshooting
3.4 Membrane Pretreatment Filters
3.4.1 Purpose and Function
3.4.2 Routine Operation
3.4.3 Performance Monitoring
3.4.4 Maintenance
3.4.5 Troubleshooting
3.5 Cartridge Filters
3.5.1 Purpose and Function
3.5.2 Routine Operation
3.5.3 Performance Monitoring
3.5.4 Troubleshooting
References
4 Reverse Osmosis System Operation
4.1 Reverse Osmosis Desalination System
4.1.1 Key RO System Components
4.1.2 Purpose and Function
4.2 Routine RO System Operation
4.2.1 Maintaining RO System Fresh Water Production Rate
4.2.2 Maintaining RO System Permeate Quality
4.2.3 Alternative Approaches for RO System Operation
4.2.4 RO System Startup
4.2.5 Key Routine Operational Tasks
4.3 Performance Monitoring
4.3.1 Performance Data Collection
4.3.2 Impacts of Source Water and Operational Parameters on RO System Performance
4.3.3 Performance Data Analysis and Normalization
4.4 RO System Maintenance
4.4.1 RO MembraneFlushingand Preservation
4.4.2 RO Membrane Cleaning
4.4.3 RO Membrane Rotation
4.4.4 RO Membrane Replacement
References
5 Reverse Osmosis System Troubleshooting
5.1 Overview of RO System Performance Challenges
5.2 RO Process Performance Challenges
5.2.1 Permeate Production Below Target Flow Rate
5.2.2 Inadequate Permeate Water Quality
5.2.3 Excessive Membrane Cleaning Frequency and Energy Use
5.3 Diagnostics of RO Membrane System Performance
5.3.1 Diagnostics of RO Membrane Integrity and Fouling Issues
5.3.2 Diagnostics of Membrane Fouling and Scaling Issues
5.3.3 Membrane Autopsy
5.4 Key Equipment Performance Issues and Troubleshooting Solutions
5.4.1 RO High—Pressure Feed Pumps
5.4.2 Energy Recovery Systems
References
6 Post—Treatment
6.1 Introduction
6.2 Lime/Carbon Dioxide Post—Treatment Systems
6.2.1 Purpose and Function
6.2.2 Routine Operation
6.2.3 Performance Monitoring
6.2.4 Maintenance
6.2.5 Troubleshooting
6.3 Calcite Conditioning Systems
6.3.1 Purpose and Function
6.3.2 Routine Operation
6.3.3 Performance Monitoring
6.3.4 Maintenance
6.3.5 Troubleshooting
6.4 Remineralization by Mixing of Desalinated and Source Waters
6.4.1 Purpose and Function
6.4.2 Routine Operation
6.4.3 Performance Monitoring
6.4.4 Maintenance
6.4.5 Troubleshooting
6.5 Disinfection Systems
6.5.1 Purpose and Function
6.5.2 Disinfection Methods
6.5.3 Routine Operation, Performance Monitoring, Maintenance, and Troubleshooting
References
7 Desalination Plant Discharge Management
7.1 Introduction
7.1.1 Concentrate
7.1.2 Backwash Water
7.1.3 Other Nonconcentrate Side Streams
7.2.Concentrate Discharge to Surface Waters
7.2.1 Purpose and Function
7.2.2 Routine Operation
7.2.3 Monitoring of Discharge Water Quantity and Quality
7.2.4 Maintenance and Troubleshooting
7.3 Backwash Settling and Sludge Dewatering Systems
7.3.1 Purpose and Function
7.3.2 Routine Operation
7.3.3 Performance Monitoring
7.3.4 Maintenance
7.3.5 Troubleshooting
References
8 Equipment Maintenance
8.1 Introduction
8.2 Pumps
8.2.1 Purpose and Function
8.2.2 Routine Inspection and Maintenance Considerations
8.2.3 Troubleshooting
8.3 Air Blowers
8.3.1 Purpose and Function
8.3.2 Routine Inspection and Maintenance
8.4 Motors
8.4.1 Purpose and Function
8.4.2 Routine Inspection and Maintenance
8.4.3 Troubleshooting
8.5 Bearings
8.5.1 Purpose and Function
8.5.2 Routine Inspection and Maintenance
8.5.3 Troubleshooting
8.6 Valves
8.6.1 Butterfly Valves
8.6.2 Plug Valves
8.6.3 Ball Valves
8.6.4 Check Valves
8.6.5 Gate Valves
8.6.6 Diaphragm Valves
8.7 Mechanical Seals
8.7.1 Purpose and Functions
8.7.2 Inspection, Maintenance, and Troubleshooting
8.8 Mechanical Drives
8.8.1 Purpose and Function
8.8.2 Inspection, Maintenance, and Troubleshooting
8.9 Chemical Feed Systems
8.9.1 Purpose and Function
8.9.2 Inspection, Maintenance, and Troubleshooting
8.10 Automatic Samplers
8.10.1 Purpose and Function
8.10.2 Inspection, Maintenance, and Troubleshooting
Reference
Glossary
Index 2100433B
水环境联合会和水分重用协会出版物描述了先进的操作、维护和故障排除的方法为反渗透咸水和海水淡化工厂市政摘要给水。所有植物组件详细讨论,从摄入和预处理放电管理。维护工厂设备也提供了实践。实际的例子说明最新的技术和实用的实现都包含在这个权威的资源。
大不大要看对淡化海水的需求和淡化后的水的作用。在中东地区,非常缺水,淡化海水的主要用途是自来水和工业应用,规模很大,比如Ashkelon 海水反渗透厂是世界最大的采用膜技术的海水淡化厂, 目前该厂提供...
据说海水淡化的成本较高。既然你生活在黄海的一个小岛上 ,黄海上的岛屿已经有先例,如长海县。你不妨到那去实地考察一下。
海水淡化工程蒸汽板供货合同
海水淡化工程蒸汽板供货合同——为进一步明确责任、保障双方利益,保证工程的顺利进行,经双方友好协商,在自愿以及完全清楚并理解本合同条款的基础上按照《中华人民共和国合同法》、《中华人民共和国建筑法》、《建筑安装工程承包合同条例》及其他有关法律、行...
华能玉环电厂海水淡化工程介绍
华能玉环电厂4×1000MW超超临界机组建在浙江省台州地区玉环县一个四周环海的小岛上,由于淡水资源紧缺,全厂使用的淡水全部采用海水淡化制取。海水淡化系统采用双膜法,即超滤+反渗透工艺,设计制水能力1440m3/h,这是目前国内乃至亚洲地区最大的采用膜法技术的海水淡化工程。
1、维护
废气锅炉的运行及维护,主要是指对液位,气压,气水质量,开车开炉,停车停炉,工艺气体进出口温度,流量等监视,调节和控制。它直接关系到整个工艺生产的稳定,蒸汽使用对象的正常运转及人身,设备的安全。正常的运行及维护,对废气锅炉设备的使用寿命和文明生产,都具有十分重要的意义。
废气锅炉与一般工业锅炉在结构形式上具有共同之点,也有不同之点,因此,运行及维护工作也有区别。两者的主要区别有下列几个方面。
1) 废气锅炉受整个工艺生产负荷变化的影响
由于废气锅炉是利用工艺生产气体的余热产生蒸汽的,因此,生产负荷的变化,工艺气体各参数的变化,都直接影响到废气锅炉水蒸气侧的水循环,气温,气压和蒸汽产量。由于没有独立的热源和燃烧设备,不能利用调节燃烧值的大少进行控制,因此废气锅炉的操作运行必须和工艺生产的控制调节联系在一起,要求相互密切配合。运行管理维护人员不仅要学会废气锅炉的技术,而且还应熟悉工艺生产的基本知识。
2)仪表检测装置准确可靠
有的废气锅炉炉膛为封闭式,承受高温高压,无法直接观察内部工艺气体在炉内的变化,只有通过仪表检测装置直接指示或间接推算出数值,因而要求仪表有较高的准确性和灵敏度。
3)工艺气体经过锅炉前后的温度
因前后生产的要求比较严格,特别是出炉的温度,与规定值误差不能太大。当工艺生产发生变化时,出口温度的控制更加困难,一般应设置调节出口温度的副线或采用其他手段。
4)操作谨慎
由于工艺生产负荷的调节和波动比较频繁,特别是生产的开停车,迫使废气锅炉也相应地改变和停炉。生产负荷的波动使蒸汽-水侧的参数包括气压,气温和蒸汽产量都应不断调节,因此在操作运行上更应仔细谨慎。
5) 控制工艺气体的流速
有的工艺气体带有灰尘,微粒和结焦物质,当气体通过废气锅炉流动速度较低时,有可能将这些物质存积在炉内,轻者将传热表面敷设一层结垢物,严重时可能将气道堵塞,导致气流阻力增加,直接无法维持生产。因此在运行时,应控制工艺气体的流动速度,特别在工艺气体负荷降低到设计允许负荷以下时,更要进行综合调节,平衡操作。由于沉积物质的存在,使炉内清理工作复杂化。
2、准备工作
要保证废气锅炉的正常运行,必须做好运行前的准备告你工作。其中包括整个废气锅炉系统的技术资料准备,主体设备和辅助设备的检查验收及炉内清理,煮炉等工作。
从事废气锅炉运行管理的工作人员,首先应对废气锅炉系统的技术性能,图纸资料,操作规程和方法,安装制造的各种验收资料,废气锅炉在整个工艺生产中的作用及地位,炉前炉后生产设备的工况,在开车停车操作过程中的调节手段等都应摸清楚,并对各种特殊情况下发生的事故能熟悉的处理。
新安装或刚检修完毕的废气锅炉及其附件,运行前不许仔细检查,如炉体外部保温层油漆防腐涂层是否完整,设备支座,特别是弹簧支座和吊架的固定是否牢固,炉内的施工要全部完整,内部换热管,上下集箱是否是否全部安装好,上升管下降管支撑都应齐全,所有安装尺寸都应符合设计图纸要求。汽包壳体及内件的安装是否完好:气泡附件,安全阀,液面计,报警器,低水位器等经过检验或检验都以合格,并且具有实验记录。所有传动设备如供水机械,加药设备等都经过单体试车,完整好用。所有管道阀门都应灵活,仪表检测装置完好,调试准确,操作方便。所有设备的基础应2坚实牢靠,开车开炉的需用物质,工器具,原材料都应准备完全。
开炉前,废气锅炉承受压力的部件,应进行水压试验或气压试验。蒸汽水侧全部采用水压实验,试压方法和部棸按设计图纸。当试压达到要求数值时,应切断进出口阀门,停止供水,保留5分钟。此时压力下降值:中压废气锅炉不超过1~2×105Pa,检查承压部件及密封处无泄漏及无残余变形现象。水压试验时除按照有关规定方法外,应有专人监视和控制压力。如不能使用水压实验,侧可采用气压试验。
对新安装,移装,改装的废气锅炉或受压元件经过重大修理或运行后停止一年以上的废气锅炉,皆需要进行一次超水压试验。其水压试验数值见下表。
废气废气
名称 |
锅炉工作压P,(MPa) |
试验压力Pa |
锅炉 |
小于6 |
1.5P但不小于2 |
残热锅炉 |
6至12 |
P 3 |
锅炉 |
大于12 |
1.25P |
3、开车运行
废气锅炉的内外部检查及试压,煮炉等准备工作完毕后,即可接受工艺气体。刚开始,工艺气体应少量进入炉内,使炉壁加热管慢慢升温,使个部分受热均匀。同时水系统也慢慢升温,此时气泡放空阀应打开,与蒸汽总管的连接阀应关闭。气泡液面保持正常水位,当水温升到100℃以上,即可产生蒸汽,此时即可将放空阀关闭,气泡开始升压当压力提升到0.5~1×105时,应冲洗玻璃液位计,防止连水管和连气管堵塞,产生假液面。当压力升到1~1.5×105时,应冲洗压力表的存水弯管,检查压力表的可靠性,气泡,炉内继续升温,经常调节工艺气体的流量及温度,使炉内水侧缓慢升温升压。当气压升到2×105时,应检查废气锅炉各部分是否泄露,并再次拧紧液面计及人孔等的螺栓。当压力升到3.5~4.0×105Pa时,需要进行气泡内的短期排污。炉内继续升压到工作压力的50%时,应对废气锅炉系统的泄露处再次拧紧螺栓和检查,如发现不正常现象,应立即停止试压,待消除故障后再进行。试压后将安全阀封好。
一切检查和试压调整合格后,就可将蒸汽送入需要的蒸汽管网,即叫并汽。在并汽前应对蒸汽管路,阀门,法兰均匀加热,将管内存积的冷凝水冲放干净,防止水击。这种暖管及排水工作应在气泡升压到三分之二工作压力时进行。并汽时应特别注意气泡液位,再次冲洗玻璃液位计,检查水位是否正常。并汽时气泡压力低于蒸汽总管压力0.5~1×105Pa,先缓慢地开启主汽阀,直到蒸汽和外界管线连通而听不到管内流动声时,才可以加快开启阀门的速度,并气时还应注意气包压力,液位和管内水击等现象。并气后,对水位严格控制,根据产气量和连续排污量适当给水,以便使液位保持稳定。从开车升温,升压至气包并气一般为23h。废气锅炉刚投入运行时,工艺气体流量小,负荷较低,一般不导入生产系统而放空,此时进炉出炉的工艺气体温度要求不严,而以水侧气温,气压的提升速度来调节。有些废气锅炉没有进出口旁路,并气后即可逐步将工艺气体全部导入炉内。有的废气锅炉在刚开车开炉时,水循环的建立比较困难,因而要特别注意工艺气体的调节和控制。如果工艺气体中含有微粒或含有焦物,则既要保证气体流速,又要放慢气包升压升温速度,两者要综合平衡操作。
并气后,废气锅炉开始正常运行。对炉内的气包液位,压力,气温,气压,气量,气水质量,工艺气体进出口温度,流量等进行操作和调节,并应严格控制。
气包的液位,是保证废气锅炉正常运行的重要标志。运行时玻璃液位计中的水位有略微波动,负荷低时水位略高,负荷高时水位稍低,在任何情况下炉内水位不能超过最低和最高水位线。正常水位的波动一般不能超过最低和最高水位线的mm。玻璃液位计每班必须冲洗一次。如果玻璃液位计内看不清水线,应立即检查摸清实际水位的高低,在没有确切知道气包内的水位之前,应停止向锅内供水。
《变电设备运行维护及异常处理》共分6章,分别是变压器及相关附属设备、SF6断路器及相关附属设备、互感器、隔离开关及附属设备、避雷器和电抗器等。《变电设备运行维护及异常处理》可作为运维人员现场培训的教材,也可以为大、中专师生提供参考。
徐波,江西电力公司职工,从事变电运行工作多年,自参加工作以来一直在第一线的岗位上,有丰富的工作经验。
本书较全面地叙述了电气设备(一次部分)及其运行维护的基本知识。全书共分十三章,主要内容包括电弧与电气触头的基本知识、开关电器、互感器、短路电流实用计算、载流导体的发热和电动力、高压电气设备的选择、电气主接线与自用电、配电装置、接地装置、电气设备的运行操作、电力变压器的运行与维护、高压配电装置的运行与维护等。
本书主要作为高职高专院校电力技术类专业的教材,也可作为电力系统的培训教材,并可供相关工程技术人员参考使用。