Foreword
Ⅰ COMPREHENSIVE REPORTS
Pumped Storage in China
Prospects for Developement of Pumpde Storage Power Power Stations
Ⅱ ENERAL SITUATION OF PUMPED STORAGE POWER STATLONS IN CHINA
Gangnan Pumped Storage Power Power Station
Miyun Pumped Storage Power Station
Panjiakou Pumped Storage Power Station
Guangzhou Pumped Storage Power Station
Shisanling Pumped Storage Power Station
Yanhu Pumped Storage Power Station
Xikou Pumped Storage Power Station
Tianhuangping Pumped Storage Power Station
Xianghongdian Pumped Storage Power Station
Shahe Pumped Storage Power Station
Tiantang Pumped Storage Power Station
Minghu and Mingtan Pumped Storage Power Station,Taiwan Province
Zhanghewan Pumped Storage Power Station
Tongbai Pumped Storage Power Station
Tai'an Pumped Storage Power Station
Baishan Pumped Storage Power Station
Ⅲ SUMMARIES OF TECHNICAL PAPERS
Gangnan:Chinqa'First Combied Pumped Storage Power Power Station
Design and Recognition of Panjiakou Combined Pumped Storage Power Power Station
Operation of Panjiakou Pumped Storage Power Power Station in North-China Power System
Giving Full Play to Roles of Pumped Storage Units in Power System
Variable Speed Operation of Panjiakou Pumped Storage Units
Economic Evaluation for Pumped Storage Power
Technical Achievements of Guangzhou Pumped Storage Project
Slipform of Inclined Penstock at Guangzhou Pumped Storage Power Power Station
Guangzhou Ⅱ. Development of Pumped Storage Electromechanical Technology
Design and Construction of Concrete Manifold in Guangzhou Pumped Storage Project
A Discussion on Operation Indexes of Pumped Storage Power Power Stations
Single Stage Pump-Turbine of Guangzhou Pumped Storage Power Power Station
Experience in Economic Dispatch and Operation of Guangzhou Pumped Storage Power Power Station
Nuclear Power Power Station and Pumped Storage Power Power Station
Major Technical Problems in Constructing at the Shisanling Pumped Storage Power Power Station
Full Anti-Seepage of Reinforced Concrete for Shisanling Upper Reservoir
Automation Design for Shisanling Pumped Storage Power Power Station
Design and Construction of Penstocks for Shisanling Pumped Storage Power Power Station
Calculation of Operation Mode and Transient Behavior for Yanghu Three-Machine Pumped Storage Power Power Station ""
Design of High Pressure Penstock at Yanghu Pumped Storage Power Power Station
Environmental Protection at Yanghu Pumped Storage Power Power Station
Construction of Xikou Pumped Storage Power Power Station
Design of Shaft-Type Powerhouse for Pumped Storage Power Power Station
Voltage Reduced Asynchronous Starting in Motor Operation Mode at Xikou Pumped Storage Power Power Station
Layout of Tianhuangping Pumped Storage Power Power Station
Bituminous Concrete Facing for Tianhuangping Upper Reservoir
A Landslide Treatment Design at Tianhuangping Pumped Storage Power Power Station
Research and Application of Slip Form System XHM-7
Drainage System Design of Tianhuangping Underground Powerhouse Caverns
Benefits Analysis for Xianghongdian Combined Pumped Storage Power Station
Characters of Xianghongdian Combined Pumped Storage Plant
Characteristics of Planning Design for Tiantang Pumped Storage Power Power Station
Development, Design and Manufacture of Pump-Turbines
Review of Pump-Turbine Hydraulic Design and Research
Pumped Storage Power Contributed to Retainable Development of Water Power2100433B
《中国抽水蓄能电站建设(英文版)》是由中国电力出版社出版的。
蓄能电站的建设条件:1、蓄能电站对电网起到调峰作用,能够提高火电机组的效率,建设蓄能电站必须是电网有足够的低谷电能。并且蓄能电站在考虑水泵、水轮发电机组的效率之后,发电收益大于火电机组因调峰而降低的收...
简单而言,用电需求多时,放水发电,提供电能;用电需求少时,进库,储存势能,待有用电需求时,再放水发电。这就是蓄能电站的基本作用。
蓄能电站可按不同情况分为不同的类型。1.按电站有无天然径流分(1)纯蓄能电站:没有或只有少量的天然来水进入上水库(以补充蒸发、渗漏损失),而作为能量载体的水体基本保持一个定量,只是在一个周期内,在上、...
天荒坪抽水蓄能电站建设
天荒坪抽水蓄能电站建设 华东勘测设计研究院 科技信息部 提 要: 本文回顾了天荒坪抽水蓄能电站的建设历程,对电站概况及枢纽布置做了较为详细 水蓄能电站2005年获国家第十一届优秀工程设计金奖,和国家第九届优秀工程勘察金奖,工程 蓄能电站勘测设计的许多关键技术,文中概述了这些成果。天荒坪抽水蓄能电站竣工后,在电 巨大的作用。 关键词:抽水蓄能电站 枢纽布置 关键技术 经济和社会效益 1 概述 天荒坪抽水蓄能电站是华东地区第一座大型的抽水蓄能电站,安装 6台300MW机组,总容量 建和在建的单个厂房装机容量最大、水头最高、电站综合效率达到 80%以上的抽水蓄能电站。 #机组)已于1998年9月30日投产,2#、4#、5#和3#机组先后于1998年12月底、1999年8月 旬及2000年3月上旬投运,最后一台机组于2000年12月发电。 天荒坪抽水蓄能电站为“八五~九五”期间国家重
惠州抽水蓄能电站建设监理综述
中南监理本着竭诚为业主服务,为工程服务的宗旨,通过推行NOSA五星安健环管理系统;严把质量关,努力打造精品工程;公平公正,做好合同管理和投资控制等举措,向业主提供了高质量、高标准的服务,确保了惠州抽水蓄能电站工程安全、质量、进度和投资等目标的实现。
回龙抽水蓄能电站工程的规划选点工作始于1991年12月,河南省计经委和原河南省电力工业局先后于1992年5月和1994年3月审查了《河南省南阳地区抽水蓄能电站规划选点报告》和《南阳回龙抽水蓄能电站可行性研究暨初步设计报告》,审查同意下库坝址及坝型。1999年8月完成了可行性研究补充报告,2000年8月河南省计委批复同意兴建回龙抽水蓄能电站。
河南省电力公司为回龙抽水蓄能电站工程建设项目法人。水利部黄河水利委员会勘测规划设计研究院为勘测和设计单位,水利部上海勘测设计研究院为监理单位,河南省电力建设总公司受业主委托进行建安工程总承包。具体分包情况为:上、下库大坝由中国安能建设总公司水电武警项目部承建(其中下库大坝分包给中国水利水电第十一工程局),中国水利水电第一工程局承建引水发电系统及厂房标段施工,河南省电力公司第一火电建设公司承担机电安装标。
2001年2月施工单位开始进场,2001年3月15日下库清理、施工围堰和拦砂坎工程开始施工;2001年6月开始下库坝基开挖工程,2001年12月开始下库坝碾压混凝土施工,2002年2月下库进出水口工程开始,2003年5月13日下库所有灌浆工作结束,5月底下库大坝混凝土工程基本结束。2100433B
《抽水蓄能电站工程建设文集》是由中国水力发电工程学会电网调峰与抽水蓄能专业委员会组编的抽水蓄能学术年会论文集,共收录70篇文章,分为5部分。论文集分为抽水蓄能发展规划与建设管理、抽水蓄能电站工程设计、抽水蓄能机组装备试验与制造、抽水蓄能电站工程施工实践及其他几大块。
回龙抽水蓄能电站工程的规划选点工作始于1991年12月,河南省计经委和原河南省电力工业局先后于1992年5月和1994年3月审查了《河南省南阳地区抽水蓄能电站规划选点报告》和《南阳回龙抽水蓄能电站可行性研究暨初步设计报告》,审查同意下库坝址及坝型。1999年8月完成了可行性研究补充报告,2000年8月河南省计委批复同意兴建回龙抽水蓄能电站。
河南省电力公司为回龙抽水蓄能电站工程建设项目法人。水利部黄河水利委员会勘测规划设计研究院为勘测和设计单位,水利部上海勘测设计研究院为监理单位,河南省电力建设总公司受业主委托进行建安工程总承包。具体分包情况为:上、下库大坝由中国安能建设总公司水电武警项目部承建(其中下库大坝分包给中国水利水电第十一工程局),中国水利水电第一工程局承建引水发电系统及厂房标段施工,河南省电力公司第一火电建设公司承担机电安装标。
2001年2月施工单位开始进场,2001年3月15日下库清理、施工围堰和拦砂坎工程开始施工;2001年6月开始下库坝基开挖工程,2001年12月开始下库坝碾压混凝土施工,2002年2月下库进出水口工程开始,2003年5月13日下库所有灌浆工作结束,5月底下库大坝混凝土工程基本结束。