雨水调蓄池设计
Stormwater Management Pond Design Steps: 1. Feasibility study: Hydrology - Dry pond or wet pond? If receive and retain enough flow from rain, runoff, and groundwater to ensure long-term viability. Undrlying Soil - Underlying soils must be identified and tested. Soil permeability must be tested in the proposed Wet Pond location to ensure that excessive infiltration will not cause the WP to
《城镇雨水调蓄工程技术规范》解读
《城镇雨水调蓄工程技术规范》解读
北京雨水调蓄知识来自于造价通云知平台上百万用户的经验与心得交流。登录注册造价通即可以了解到相关北京雨水调蓄 更新的精华知识、热门知识、相关问答、行业资讯及精品资料下载。同时,造价通还为您提供材价查询、测算、询价、云造价等建设行业领域优质服务。