特高压直流输电工程阀厅接地开关布置优化(英文)
The switches installed in converter station valve halls in Xiangjiaba-Shanghai ±800 kV UHVDC project are expensive and maintenance inconvenience.Two optimization schemes of the valve hall grounding switches for researches on the function and operation of the switchers are presented.The two schemes are both studied in detail,with one way of abolishing all grounding switches on transformer valve side,and another way of partly cancelling the switches.Detailed analysis is further carried out for the feasibility and the pros and cons of the two schemes.Based on the comparison of two schemes,the partial reduction of grounding switches is selected to get a simulation with an EMTDC model.Plus in order to verify the reliability of the simulating results,a field test is carried out in Fengxian converter station with the partly switches cancellation scheme.The test results proved that using only one switch can still release residual charge in the valve hall in a relatively short period.Optimized designs of the valve hall switches can save both space and costs of the project.
室内开关布置图知识来自于造价通云知平台上百万用户的经验与心得交流。登录注册造价通即可以了解到相关室内开关布置图 更新的精华知识、热门知识、相关问答、行业资讯及精品资料下载。同时,造价通还为您提供材价查询、测算、询价、云造价等建设行业领域优质服务。