·耐酸碱腐蚀性佳
·防尘,防水,防霉
·耐磨损,耐重压,不易龟裂
Production Scope
· Excellent acid and alkali erosion resistance.
· Dustproof, waterproof and mildew-proof.
· Wearing endurable, heavy load endurable and no cracks.
施工工艺 :
·原地面处理
·防腐底漆
·防腐油
·铺设玻纤布层
·防腐油
·铺设玻纤布层
·防腐油
·铺设玻纤布层
·防腐油
·防腐面层
Construction Techniques:
· Original Ground Treatment.
· Anti-erosion prime coat.
·Anti-erosion oil.
· Pave the glass fiber layer.
·Anti-erosion oil.
· Pave the glass fiber layer.
·Anti-erosion oil.
· Pave the glass fiber layer.
·Anti-erosion oil.
·Anti-erosion finish coat.
技术指标 :
参 数 项 目ITEMS | 单 位unit | 参数指标index |
抗压强度Compressive Strength | MPa | ≥130 |
弯曲强度Bending Strength | MPa | ≥230 |
拉伸强度Tensile Strength | MPa | ≥100 |
冲击韧性Strike Resistance | MPa | ≥270 |
吸水率Water Absorption | % | ≤0.02 |
收缩率Contractibility | % | ≤0.2 |
耐H2SO4,50% H2SO4,50% Resistance | 48天无变化no change for 48 days | |
耐HNO3,15% HNO3,15% Resistance | 48天无变化no change for 48 days | |
耐CH3CHOOH,40% CH3CHOOH,40% Resistance | 48天无变化no change for 48 days | |
耐NaOH,15% NaOH,15% Resistance | 48天无变化no change for 48 days |
四、施工工艺
为规范施工流程,保证产品质量,现针对不同的地面制定施工工艺如下:
(一)新混凝土地面的施工方法:
1、清理现场物资,铲除地面杂物,对现场进行清扫后用吸尘器吸去表面灰尘(严禁用水冲洗)。
2、使用彩色地坪渗透剂对地面进行均匀涂刷(材料用量根据地面情况调整)。
3、地坪渗透剂施工八小时后,对地面进行检查,根据地面实际情况进行修补(若使用腻子修补,需在腻子干透后打磨平整并使用吸尘器清洁表面灰尘)。
4、对修补后的地面使用地坪固化剂进行均匀涂刷(材料用量根据地面实际情况)。
(二)旧混凝土地面的施工方法
1、清理现场物资,铲除地面杂物,对现场进行清扫后用吸尘器吸去表面灰尘(严禁用水冲洗)。
2、使用透明地坪渗透剂对地面进行均匀涂刷(材料用量根据地面情况调整)。
3、地坪渗透剂施工八小时后,使用按规定调配好的腻子对地面进行处理。
4、对刮好腻子并干透后的地面使用打磨机打磨平整,并使用吸尘器彻底清洁表面灰尘。
5、对修补后的地面使用地坪固化剂分两次均匀涂刷(材料用量根据地面实际情况)。
五、注意事项:
1、地面施工前必须保持干燥,严禁用水清洗;
2、本产品使用前充分搅拌均匀;
3、本产品储藏温度应在5℃~35℃左右;
4、开启后应尽量用完,禁止不密封保存