Foreword
1 Scope
2 Normative References
3 General
4 Survey
5 Diversion and Flood Control
5.1 General
5.2 Diversion during construction
5.3 Interception
5.4 Flood control
6 Treatment of Dam Foundation and Abutment Slopes
7 Re-inspection and Usage Plan of Dam Material
7.1 Re-inspection
7.2 usage Plan
8 Construction Test and Dam Material Processing
8.1 Construction test
8.2 Dam material Processing
9 Exploitation and Transportation of Dam Material
9.1 Exportation
9.2 Transportation
10 Filling
10.1 General
10.2 Filling
10.3 Construction During rainy season
10.4 Filling at negative temperature
10.5 Construction of impervious body with non-soil material
11 Treatment of Jointing portion
12 Filter,Drainge and Revetment
12.1 Filter
12.2 Drainage
12.3 Revetment
13 Safety Monitoring
14 Construction Quality Control
14.1 General
14.2 Quality control of dam foundation treatment
14.3 Quality control of borrow area
14.4 Quality control of dam filling
14.5 Quality control of revetment and drainage filter
Appendix A (Normative Appendix)Processing and Treatment of Dam Material
Appendix B (Normative Appendix)Compaction Test
Appendix C (Normative Appendix)Quality Control Management of Compaction
Appendix D (Normative Appendix)Definition of Expression2100433B