the ASCE definition is, briefly described as a method of installing pipes by Pipe Jacking, to an accuracy of 25mm line and grade over any distance, using a remote controlled closed face MTBM which provides support to the ground and is capable of controlling ground water, spoil is removed by an automated system and no man entry to the tunnel is required for normal operations.