1 Drilling Case 1:Preparation before Spud in
钻井工况一:钻前准备
1.1 Dialogues for exploring moving routes
勘察搬迁路线场景对话
1.2 Equipment Move and Installation
设备搬迁与安装
2 Drilling Case 2:20in Conductor Operation
钻井工况二:20in导管作业
2.1 Drill 24in hole 钻24in井眼
2.2 Running 20in conductor(welding)
下20in导管(焊接)
2.3 Running 20in conductor(makeup)
下20in导管(上扣)
3 Drilling Case 3:171/2 in Surface Hole Operation
钻井工况三:171/2 in表层施工
3.1 Preparation before spud in 开钻前准备
3.2 Drilling 钻进
3.3 13 3/8in casing cementing 133/8 in 套管固井
4 Drilling Case 4:121/4 in Interval Operation
钻井工况四:121/4 in井段施工
4.1 Drilling abnormally钻进异常情况
4.2 Making a trip 起下钻
4.3 Cementing with 95/8in casing 95/8in套管固井
5 Drilling Case 5:The Operation of 81/2 in Hole
钻井工况五:81/2in井眼施工
5.1 Drilling 81/2 in hole 钻进81/2 in井眼
5.2 Tripping out and tripping in 起下钻
5.3 Safety conference before the wireline logging
电测前安全工作会议
5.4 7in Casing cementing 7in 套管固井
6 Drilling Case 6:Completion
钻井工况六:完井
6.1 Completion 完井
6.2 Detection for the sling,shackle and other lifting
equipment 绳套、卸扣等吊装设备等检测
6.3 The drilling tools inspection钻具检测
7 Drilling Case 7:Safety meeting before testing operations
钻井工况七:试油作业前安全会
7.1 The safety conference before testing perforation
试油射孔前安全会议
7.2 The safety conference before oil testing with completion
casing 试油前(有完井套管)安全会议
8 Drilling Case 8:Drilling Accidents and treatment
钻井工况八:钻井事故与解除
8.1 Handling sticking 处理卡钻
8.2 Loss during drilling 钻遇漏失
8.3 Dealing with loss 处理漏失
8.4 Fishing tools 打捞工具
8.5 Technical discussion on a nozzle plugged
堵水眼技术交流
9 Drilling Case 9:Daily Talk
钻井工况九:日常生活对话
9.1 A rig manager asking the toolpusher about the
employees on the drill floor
平台经理在钻台上和带班队长询问雇员情况
9.2 Daily inquiry of the rig manager1
平台经理日常询问1
9.3 Daily inquiry of the rig manager 2
平台经理日常询问2
9.4 Introduction to income and expenses
收入与支出介绍
9.5 Celebrating festivals 雇员过节
9.6 Drainage during rain 下雨排水
9.7 Drilling strings management钻具管理
10 Vocabulary
词汇表2100433B