主体现浇面模板支撑方案
目录 一、工程概括····························2 二、施工准备····························2 三、工艺流程····························3 四、操作工艺····························3 五、模板支撑····························3 六、模板拆除····························13 七、成品保护····························14 八、应注意的问题························14 九、工程安全技术························14 2 主体模板工程专项施工方案 一、工程概况 宜昌联邦电缆有限公司立式交联电缆车间, 该建筑物地下二层, 地上二十三 层,上部主
主体现浇面模板支撑方案 (2)
目录 一、工程概括····························2 二、施工准备····························2 三、工艺流程····························3 四、操作工艺····························3 五、模板支撑····························3 六、模板拆除····························13 七、成品保护····························14 八、应注意的问题························14 九、工程安全技术························14 2 主体模板工程专项施工方案 一、工程概况 宜昌联邦电缆有限公司立式交联电缆车间, 该建筑物地下二层, 地上二十三 层,上部主