《环境治理项目规划与管理(英文版)》以环境治理项目规划与管理的过程为主线,吸收了国内外最新的环保项目管理的理论和方法,结合案例,完整地阐述了环保项目规划与管理的知识体系。全书共设14章、1个附录和3个案例。主要介绍了以下几个方面的内容:我国环保产业的驱动力、复杂性和特征,项目管理理论,环保项目的规划、追踪和控制,环保项目调研及可行性分析,环保项目的设计,环保项目的实施。
Preface
Chapter 1 Introduction
1.1 The environmental remediation industry in China
1.2 Regulatory overview
1.3 The changing market for remediation services
1.4 Modem project management
Chapter 2 Strategic Issues in Environmental Remediation
2.1 Significant environmental statues
2.1.1 The environmental protection law
2.1.2 Regulations related to the "three wastes
2.1.3 Other statues related to industrial waste management
2.2 Fundamentals of environmental remediation
2.2.1 The areas of potential project savings "'"
2.2.2 The four phases of environmental contamination
2.2.3 Factors that affect contaminant distribution and migration contaminant properties
2.2.4 Environmental assessment, techniques, and advancements
2.2.5 Remediation processes and advancements
2.3 Complicating factors in environmental remediation
2.3.1 Differing objectives of project stakeholders
2.3.2 Charged political nature of environmental remediation projects
2.3.3 Conflicting regulations
2.3.4 Effect of complicating factors on remedy selection
2.4 Scope management
Chapter 3 General Project Management Concepts
3.1 Environmental project management
3.1.1 What is a project"para" label-module="para">
3.1.2 Project management definition
3.1.3 Environmental project management
3.2 Project criteria
3.3 Project management resources
3.4 Project management functions
3.4.1 Project integration management
3.4.2 The four core functions (knowledge areas)
3.4.3 Four facilitating functions
3.5 Project management steps
3.6 Project management functions and boundaries
3.7 Project monitoring and controlling
3.7.1 Project monitoring
3.7.2 Project control
3.8 Project life cycle
3.8.1 Project phase activities
3.8.2 Significance of the phases
3.9 The environmental industry life cycle
3.10 The project planning and control cycle
3.11 General RPM responsibilities during RD/RA
Chapter 4 Reviewing Request for Proposal
4.1 Request for proposal
4.2 Importance of a high-quality proposal
4.3 Aproposal is a project
4.4 Recommended proposal format
4.5 Basis for the bid-no bid evaluation
4.5.1 The bid-no bid evaluation process
4.5.2 The proposal manager and team
4.6 Summarizing data
4.6.1 Categories of information
4.6.2 Site visit/data gathering
4.7 Identifying objectives
4.8 Specifications
4.8.1 Detailed design specifications
4.8.2 Performance-based specifications
4.9 Political, economical, and technological considerations
4.10 Stakeholder analysis
4.10.1 The.project stakeholder management process
4.10.2 Identifying project stakeholders
4.10.3 Identification of mission
4.10.4 Predicting stakeholder strategy and behavior
4.11 Initial risk identification
4.11.1 Definition of project risk
4.11.2 Project risk factors
4.11.3 Risk management
4.11.4 Contract strategy considerations
4.11.5 Overall project risks
Chapter 5 Assembling Project Teams
5.1 Identifying key project personnel
5.1.1 Skill sets required to perform tasks
5.1.2 Typical project team
5.1.3 Assembling a technical review team
5.1.4 Availability of personnel
5.1.5 Commitment and leadership
5.2 Team planning and geographical distribution
5.3 Project work plan completion/linear responsibility chart
5.4 The project office and location
Chapter 6 Developing a Work Breakdown Structure
6.1 Definition of work breakdown structure
6.2 Work breakdown structure formats
6.2.1 Tree diagram format
6.2.2 Indented outline format
6.3 Work breakdown structure functions
6.4 Work breakdown structure specifications
6.5 Techniques for WBS development
6.6 Scope of work based on the work breakdown structure
6.7 Risk management considerations
Chapter 7 Diagramming/Scheduling
7.1 What is so difficult about scheduling
7.2 Schedule definition
7.3 Project time management
7.3.1 Activity sequencing
7.3.2 Duration estimating
7.3.3 Schedule development
7.3.4 Time control
7.4 Method of developing an optimum schedule for an accelerated project
Chapter 8 Cost Estimating
8.1 Project cost management
8.2 Cost classification
8.2.1 Direct cost
8.2.2 Indirect cost
8.3 Types of cost estimates
8.4 Information required for assigning resources/cost estimating
8.5 Impact of resource assignment on duration estimating
8.6 General process for assigning resources/cost estimating
8.7 Contingency estimating on lump sum contracts
Chapter 9 Earned Value Analysis
9.1 Earned value analysis
9.2 Definition of terms
9.3 Variance calculations
9.4 Graphical earned value analysis
9.5 Cost and schedule forecasting
9.5.1 Calculation of estimate at completion
9.5.2 Calculation of estimated duration at completion
9.6 Causes of project variance
Chapter 10 Advanced Project Planning and Risk Management
10.1 Understanding quantitative decision analysis
10.2 Structuring the decision problem
10.2.1 Decision tree
10.2.2 Influence diagrams
Chapter 11 Remedial Investigation/Feasibility Study (RI/FS)
11.1 Scoping
11.2 Site characterization
11.2.1 Define site physical characteristics
11.2.2 Characterize sources of contamination
11.2.3 Characterize nature and extent of contamination
11.2.4 Perform data analysis
11.2.5 Define contaminant fate and transport
11.2.6 Define contaminant-and location-specific requirements
11.2.7 Evaluate additional data needs
11.2.8 Preliminary site characterization summary
11.3 Development and screening of alternatives
11.4 Treat-ability studies
11.4.1 Level of treat-ability studies
11.4.2 Suggested content for a pilot-scale treat-ability study work plan
11.4.3 Determining the need for treat-ability studies
11.4.4 Timing of treat-ability studies
11.4.5 Treat-ability study goals 2100433B
环境规划与管理的研究,即在利用现有的科学技术解决开发与环境的冲突,期使经济成长与环境保护达到平衡。对损害环境质量的人类活动加以纠正,协调发展与环境的冲突,达到资源可持续利用及促类形成更发展更进步的新文...
专业核心课程与主要实践环节:生态学、自然环境概论、环境工程、污染源控制、环境经济学、环境系统工程、环境监测管理、土地规划与管理、环境预测与决策、环境规划、环境质量评价、环境法、水气固液污染量控制工程、...
如果按你的表上面,属于工学大类。看你的表应该不是城乡规划专业办的很正规的学校。目前城乡规划专业属于一级学科,分两类,一类是在工学建筑类衍生出来的,相对正规;一类是在理学人文地理类衍生出来的,注重理论分...
河南省某矿山环境治理项目监理规划
河南省某矿山环境治理项目监理规划——矿山环境治理项目的监理跟建筑工程区别很大,市场不前不是很成熟。稿件为本人亲别所写,监理报告另外附上。 施工质量监理 根据项目特点,我监理方将采用施工前的文件审查和施工过程中的跟踪检查对施工质量进行监理...
矿山生态环境治理规划实施过程中的信息管理
目前地勘系统的各类规划成果主要以文字报告、规划蓝图和数字表格三部分组成,随着国家经济建设的高速发展,我们已经进入信息时代,传统的规划管理模式已不能满足现代管理要求。通过建立矿山数据库和矿山生态环境治理规划管理系统,探索规划在实施过程中的信息化动态管理方法。
《铀矿冶设施退役与环境治理》由原子能出版社出版。
项目规划是从现实出发的思考、想像和谋划,进而确定、决定和安排实现项目目标所必需的各种活动和工作成果。
内容简介
工业化的不断发展加快了我国城市化的进程,也使城市的水资源与环境受到不同程度的破坏,对城市的水环境进行综合整治已迫在眉睫。健全水环境治理基础设施、科学治理城市水污染是创造城市优越生存环境的前提,本书针对水环境治理与资源利用进行分析。 2100433B