Foreword
1 ScOpe
2 Normative Reflerence
3 General
4 Terms and Definition
5 Plane Control Survev
5.1 General nJl''es
5.2 Teehnical design
5.3 POint selection,embedment and survey marks Of plane control network
5.4 Horizontal angle observation
5.5 Electro.optical distance survey
5.6 G10bal positioning system(GPS)survey
5.7 Result check and adjustment calCUlation
5.8 Maintenance and management Ofplane control network
6 Elevatioil Control Survev
6.1 General mles
6.2 Teehnical requirements for leveliIlg salvey
6.3 Trigonometric traverse leveliIlg with electro.optical ranging
6.4 River.crossing trigonometric 1eveling w油electro.optical ranging
6.5 FlieIdwork resuIt processing and adjustment calculation
7 Topographic Survey
7.1 General mles
7.2 Mapping base eontrol salvey
7.3 Requirements for topographic map surveying and mapping
7.4 Digitized mapping
7.5 Underwater topographic survey
8 Preparation Of Setting.OUt Survey
8.1 General rules
8.2 Survey data collection and setting.OUt plan preparation
8.3 Setting.out data processing
8.4 Selection Of setting.Oilt methods and setting.out station
8.5 IrIspection Ofinstrument and salvey apparatus
9 Excavation,Filling and Concrete Construction Survey
9.1 General mles
9.2 Excavation survey
9.3 Survey Of filling and conerete construction
9.4 Setting.out point checking
9.5 Section survey and construction quantity calculation
9.6 Data processing
10 Metal Structure and Electro.mechanical Equipment Installation Survey
10.1 General nlles
10.2 SHIVey and mapping 0f specific installation control network
installation axis point and elevation basic poiIlt
10.3 Setting ont 0finstallation pointS
10.4 Check Ofinstallation setting.out pOints...
10.5 Data processing
11 Underground Works Survey
11.1 General rules
11.2 Control survey outside tunnel
11.3 Control survey inside tunnel
11.4 Construction setting out and section survey
11.5 Data processing
12 Dredging Works, Canal and Dyke Survey
12.1 Dredging works survey
12.2 Canal and dyke survey
12.3 Data processing
13 Ancillary Works Survey
13.1 General rules
13.2 Survey of screening, mixing and belt conveyor feeding systems ~
13.3 Survey of cable-crane, tower-crane and bridge-crane
13.4 Cofferdam and embankment dyke construction survey
13.5 Data processing
14 Deformation Monitoring During Construction Period
14.1 General rules
14.2 Point selection and embedment
14.3 Horizontal displacement observation
14.4 Vertical displacement observation
14.5 Calculation and data processing
15 Construction Completion Survey
15.1 General rules
15.2 Earth-rock excavation and filling works
15.3 Concrete works
15.4 Metal structure and electro-mechanical equipment installation works
15.5 Data processing
16 Data Compilation2100433B