支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 21001000.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 31501000.440.450.440.660.440.720.440.900.441.090.441.180.441.270.441.360.44
只需 填入 桥架 长度 、梁 高、 距梁 高 度, 其他 自动 计 算, 其他 已锁 定如 需更 改密 码123 桥架 宽度 取中间值d+e-20 (a+20+b+2 0)*2 桥架桥架桥架长度m结构梁高距梁高度支架间距单吊长度吊框长度吊杆个φ10吊架 50508001001.588028020.617 100508001001.588038020.617 1001004002001.558048020.617 桥架 宽度 暂取中间 值 d+e+ba+100 桥架桥架桥架长度m结构梁高距梁高度支架间距单吊长度横梁长度吊杆个φ10吊架比 1001504002001.575020020.617 200504002001.565030020.617 20010040020
支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.360.450.360.360.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 21001000.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 31501000.440.450.440.660.440.720.440.900.441.090.441.180.441.270.441.360.44
中国大唐集团公司 基建工程施工作业指导书 (电缆桥架、支架安装) 中国大唐集团公司 2009年8月 施工作业指导书目录 1目的 2适用范围 3参考文件 4工程概况及工程量 4.1工程概况 4.2主要工程量 5作业前的条件和准备 5.1技术准备 5.2作业人员配置、资格和要求 5.3主要施工机械、作业工器具 5.4安全器具 5.5材料要求 5.6工序交接要求 5.7其它 6作业程序及方法 6.1主要施工步骤 6.2施工工艺流程图 6.3施工方法及要求 6.4成品保护措施及要求 7质量控制点及质量通病预防 版 次 7.1质量目标 7.2作业过程质量控制点的设置 7.3质量通病预防措施 7.4质量标准和要求 8作业的安全危害及环境因素辩识和控制 8.1作业安全危害因素辨识及控制对策表 8.2作业环境因素辨识及控制对策表 8.3作业的安全
支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.320.410.320.600.320.660.320.820.320.990.321.070.321.150.321.230.321.320.321.480.321.65∟40*40*4/φ10 21001000.320.410.320.600.320.660.320.820.320.990.321.070.321.150.321.230.321.320.321.480.321.65∟40*40*4/φ10 31501000.400.410.400.600.400.660.400.820.400.990.401.
支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.360.450.360.360.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81∟40*40*4/φ10 21001000.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81∟40*40*4/φ10 31501000.440.450.440.660.440.720.440.900.441.090.441.
电缆桥架支架安装与图例 电缆桥架系指电缆梯架、电缆托盘及金属线槽。 电缆桥架主要有钢制、铝合金制及玻璃钢制等。钢制桥架表面 处理分为喷漆、喷塑、电镀锌,热镀锌、粉沫静电喷涂等工艺。 电缆桥架得安装主要有沿顶板安装。沿墙水平与垂直安装、沿竖井 安装、沿地面安装。沿电缆沟及管道支架安装等。安装所用支(吊)架可 选用成品或自制。支(吊)架得固定方式主要有预埋铁件上焊接,膨胀螺 栓固定等。桥架安装应符合以下规定: 1.直线段钢制电缆桥架长度超过30m,铝合金或玻钢制桥架长度超过 15m时,设有伸缩节;电缆桥架跨越建筑变形缝处设置补偿装置、 2.电缆桥架应在下列地方设置吊架或支架: 2.1桥架接头两端0、5m处; 2、2每间距1、5~3m处; 2.3转弯处; 2.4垂直桥架每隔1、5米处、 3.吊架与支架安装保持垂直、整齐、牢固、
. 精品文档 电缆桥架支架安装与图例 电缆桥架系指电缆梯架、电缆托盘及金属线槽。 电缆桥架主要有钢制、铝合金制及玻璃钢制等。钢制桥架表面 处理分为喷漆、喷塑、电镀锌,热镀锌、粉沫静电喷涂等工艺。 电缆桥架的安装主要有沿顶板安装。沿墙水平和垂直安装、沿竖井 安装、沿地面安装。沿电缆沟及管道支架安装等。安装所用支(吊)架 可选用成品或自制。支(吊)架的固定方式主要有预埋铁件上焊接, 膨胀螺栓固定等。桥架安装应符合以下规定: 1.直线段钢制电缆桥架长度超过30m,铝合金或玻钢制桥架长度超过 15m时,设有伸缩节;电缆桥架跨越建筑变形缝处设置补偿装置. 2.电缆桥架应在下列地方设置吊架或支架: 2.1桥架接头两端0.5m处; 2.2每间距1.5~3m处; 2.3转弯处; 2.4垂直桥架每隔1.5米处. 3.吊架和支架安装保持垂直、整齐、牢固
只需填入桥架长度、梁高、距梁高度,其他自动计算,其他已锁定如需更改密码123 桥架宽度100mm以下的吊架采用单杆吊架,按照图集04d701-3-77~78页方案9;桥架间距按规范gb50303-2002第33页 取中间值d+e-20 (a+20+b+2 0)*2 桥架宽桥架高桥架长度m结构梁高mm距梁高度mm支架间距m单吊长度mm吊框长度mm吊杆个数φ10吊架kg/m 50508001001.588028020.617 100508001001.588038020.617 1001004002001.558048020.617 桥架宽度150~1200采用圆钢门架支架,门架横担型钢详下表, 暂取中间 值 d+e+ba+100 桥架宽桥架高桥架长度m结构梁高mm距梁高度mm支架间距单吊长度横梁长度
支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.360.450.360.360.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81∟40*40*4/φ10 21001000.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81∟40*40*4/φ10 31501000.440.450.440.660.440.720.440.900.441.090.441.
宽mm高mmmmmmm角钢型号 质量 (kg/m) 通丝/角钢 型号 3002004307301500∟50*50*53.77∟50*50*5 备注:2.422kg/m 3.77kg/m 0.888kg/m 0.617kg/m 个人建议:架桥尺寸宽+高小于400mm请选用横担角钢∟40*40*4,吊杆通丝φ10 架桥尺寸宽+高大于400mm请选用横担角钢∟50*50*5,吊杆通丝φ12 架桥尺寸宽+高大于600mm请选用横担角钢∟50*50*5,吊杆角钢∟40*40*4 如施工请实际选择 通丝φ12 通丝φ10 桥架长度 桥架底板 距顶高度 桥架支架 间距 桥架规格 电缆桥架支架计算 支架 横担吊杆 角钢∟40*40*4 角钢∟50*50*5 质量 (kg/m)%kgkgkg 3.
支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.360.450.360.360.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81∟40*40*4/φ10 21001000.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81∟40*40*4/φ10 31501000.440.450.440.660.440.720.440.900.441.090.441.
支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.360.450.360.360.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 21001000.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 31501000.440.450.440.660.440.720.440.900.441.090.441.180.441.270.441.360.44
支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.360.450.360.360.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 21001000.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 31501000.440.450.440.660.440.720.440.900.441.090.441.180.441.270.441.360.44
广西电力工程建设公司 guangxipowerconstructioncompany南方电网 电气专业作业指导书 电缆支架、桥架安装1 目录 一、目的和范围⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯2 二、编写依据⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯2 三、作业前应具备的条件和应做的准备⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯2 四、参加人员资格要求⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯3 五、作业人员职责分工和权限⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯3 六、所需工器具和仪器的规格及精度----------------------------------------------3 七、作业流程、方法和内容⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯4 八、作业过程中质量控制点及其控制措施⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯7 九、作业结束后的检查验收和应达
支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.360.450.360.360.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 21001000.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81 31501000.440.450.440.660.440.720.440.900.441.090.441.180.441.270.441.360.44
支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆支架吊杆 1100500.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81∟40*40*4/φ10 21001000.360.450.360.660.360.720.360.900.361.090.361.180.361.270.361.360.361.450.361.630.361.81∟40*40*4/φ10 31501000.440.450.440.660.440.720.440.900.441.090.441.
电缆桥架系指电缆梯架、电缆托盘及金属线槽。 电缆桥架主要有钢制、铝合金制及玻璃钢制等。钢制桥架表面处理分为喷漆、喷塑、电 镀锌,热镀锌、粉沫静电喷涂等工艺。 电缆桥架的安装主要有沿顶板安装。沿墙水平和垂直安装、沿竖井安装、沿地面安装。 沿电缆沟及管道支架安装等。安装所用支(吊)架可选用成品或自制。支(吊)架的固定方 式主要有预埋铁件上焊接,膨胀螺栓固定等。桥架安装应符合以下规定: 1.直线段钢制电缆桥架长度超过30m,铝合金或玻钢制桥架长度超过15m时,设有伸缩节; 电缆桥架跨越建筑变形缝处设置补偿装置. 2.电缆桥架应在下列地方设置吊架或支架: 2.1桥架接头两端0.5m处; 2.2每间距1.5~3m处; 2.3转弯处; 2.4垂直桥架每隔1.5米处. 3.吊架和支架安装保持垂直、整齐、牢固、无歪斜现象。 4.桥架连接板螺栓固定紧固无遗漏,螺母位于桥
专业电气 编号nd-dz-0-d-005 版次a/0 页数14 工程代码1ach01000 作业指导书 工程名称:纳雍电厂4×300mw机组新建工程 名称:全厂电缆桥架、支架安装 编制单位: 编制人: 专职工程师: 施工管理科: 质量管理科: 安全管理科: 总工程师: 贵州电力建设第一工程公司纳雍电厂项目分公司 编制时间2002年2月22日 目录 1.编制依据 2.概况和特点 3.范围 4.施工进度计划 5.作业条件 6.劳动力计划 7.机工具配备 8.材料、设备要求 9.操作工艺流程图 10.作业程序、方法 11.质量标准 12.安全文明施工措施 1.编制依据 钠雍电厂新建4×300mw工程施工组织总设计; 电自工程处专业组织设计; 电缆桥架、支架敷设图; 电气装置安装工程电缆线路施工及验收规范